After the winter brake, the construction of D3 highway (Úsilné – Hodějovice) continues again. We participate as the main surveyor of the contractor. During the inspection of the works, these aerial photos were taken where the 1 km long Pohůrka tunnel is going to be.
DCIM101MEDIADJI_0222.JPG
DCIM101MEDIADJI_0244.JPG
DCIM101MEDIADJI_0245.JPG